Wednesday, December 10, 2008
Tuesday, July 29, 2008
Sunday, July 13, 2008
Wednesday, June 4, 2008
Started hacking into the cylinder last night. Took about an hour to get one transfer port semi-done.
I also need more Dremel bits...
TIP: Make sure you stuff the cylinder with a rag while doing port work. There were a couple of times where my Dremel slipped and if I hadn't had the rag in place I would have gouged the inner wall of the cylinder.
Tuesday, June 3, 2008
Here are marks for some of the porting to be done to the cylinder.
I can't widen the transfers quite as much as marked, but I can take out quite a bit. The TCCD kit bulges out on the sides to have enough room for the huge transfer ports.
I can really take out a lot of the material on the exhaust port, but need to be careful to maintain the ramp as that helps draw the charge back in to scavenge the cylinder of fuel.
And here's the mark for cutting the sleeve.
Sunday, June 1, 2008
Port job. Matched to a TCCD 50cc kit. Started with a Dremel high speed cutting bit to take out most of the meat. Moved to a slim stone grinding bit to even out the ramp. Next some hand sanding with 180 grit sand paper, and finished off with some 400 grit sand paper to smooth out the finish.
Results look good.
Tuesday, May 27, 2008
The Boss pipe came. I have to do some major grinding on the header to get it to seat properly within the recesses on the cylinder.
I also did some Dremel grinding to flatten out a couple of manufacturing flaws on the header's mating surface, followed by some wet sanding with 180 grit on a small piece of bathroom tile to further flush the header surface. I rounded it out with some 400 grit, and now it looks to be an even surface.
I cracked the case yesterday and installed new bearings and seals. Next is to case match to the ports on the TCCD 50 kit.
Subscribe to:
Comments (Atom)